Project Details

Client: Confidential

Location: Paris, France

Solution provided:

Project type: Load Bank Commissioning

Paris Data Centre Phase 2

Overview

As part of a critical commissioning phase for a new data centre facility in Paris, PowerLoad successfully deployed a 500kW Load Bank Unit in conjunction with our 10-Spigot Manifold System.

This deployment was conducted over a 3-week period, simulating the thermal and electrical load of 10 fully populated server racks to validate the infrastructure’s capacity and cooling performance under realistic operating conditions.

The system was engineered for precision and efficiency, enabling seamless integration with the facility’s cooling network and delivering reliable, controlled test results. As a result, the client can now proceed with confidence, knowing that their cooling systems have been rigorously tested to meet design intent, ensuring robust performance under operational loads.

Speak to an engineer today!

Call or send us an email and we’ll be in touch with 24hrs