Base build

Base build testingLB500LB600LB700ACLB 200Standard or solid-state switching

End-of-line

End-of-line testingLCLB 160LCLB 240ACLB 60

Applications

Cooling

Chillers and cooling plantStatic and dynamic load testing

Power

UPS systemsGeneratorsSwitchgear and power qualityProtection settings

Explained

Liquid coolingGPU load testingWater qualityLoop monitoringCommissioning

Equipment

Commissioning equipment

Manifold trolleyFlushing & refill cart

Tools

The full rangeSizing calculatorDatasheets

Services

Commissioning supportLoad bank hireHigh load simulationBespoke load banksSupply and installationMaintenance and repairDeployment and managementBuy or hireProjects

Company

AboutPartnersProjectsAcademyNewsEventsFAQ Speak to the team
Liquid-cooled · GPU emulation · UK built

Liquid-cooled load banks for AI data centres.

AI has changed the behaviour of the load. Our UK-built load banks and GPU emulators replicate it, so you can prove your cooling and power respond before the GPUs arrive. Testing the future of data centre cooling.

UK engineered CE and UL certified Field-proven across Europe
Scroll
Deployed on live liquid-cooled projects London Frankfurt Helsinki Paris Munich Sweden Finland India UAE
What has changed

AI has changed the behaviour of the load

A one megawatt hall used to mean one megawatt of steady load and heat. GPU racks now swing from 25 to 100 percent in milliseconds, and drop again just as fast, so the whole system has to respond in both directions.

So the test is no longer only capacity. It is how the CDUs, pumps, valves, controls and power chain respond when the load changes.

Real GPU transient Steady-state load
Live rack draw swings 25 to 100 percent, up and down
Applications

Test how the whole system responds

Not just cooling capacity: the cooling and the power, with load rising and falling. These are the six things we help you test.

Chillers and cooling plant

Cooling has to follow the load down as well as up. Test it in both directions.

Static and dynamic load testing

Static tests prove capacity. Dynamic tests show how the system responds when load changes.

UPS systems

Built for smooth loads, so test them against the rapid changes of AI compute.

Generators

Mechanical systems take time to respond. Transient load tests show the gap.

Switchgear and power quality

Load swings cause voltage dips and spikes that a steady load does not show.

Protection settings

Protection reacts to spikes, not average load. Test settings against transient electrical spikes.

All applications →

The range

AI grade liquid-cooled load banks

Base build units prove the heat load and cooling plant while the hall is built. End-of-line emulators replicate true rack-level heat and electrical load, as the GPUs will behave. The flushing and refill cart cleans and fills the loop for both.

See the full range of products Capacities, specifications and datasheets for the whole range, side by side. View all products →
Latest news and events

Latest news and future events

Partnerships, projects and where to meet the PowerLoad team.

Sign up to the latest news

Remote monitoring

Remote monitoring across up to 250 units

Network up to 250 units on one controller. Monitor flow, temperature and pressure live, and export test data for the commissioning record.

  • Up to 250 units on a single controller
  • Live flow, temperature and pressure monitoring
  • Exportable reports for commissioning records
PowerLoad remote monitoring and reporting dashboard
Why PowerLoad

More than a load bank

PowerLoad brings together experience in power, cooling, load banks, flushing and commissioning. When you work with us, you work with a team that understands the data centre and what you are trying to prove, not only a company that can supply a load bank.

Our CEO, Brendan Leonard, has more than 40 years in data centre cooling. In this video he explains how cooling has evolved, and why the way it is tested has to change with it.

5:46
The evolution of coolingBrendan Leonard, CEO

About PowerLoad →

Why PowerLoad

Give us your design and we replicate its live performance before the hall goes live. Commissioning teams know the infrastructure will work when the equipment goes in.

We work with our customers to de-risk the project.

Projects

Liquid-cooled projects across Europe

Real liquid-cooled load bank deployments on live data centre projects, with further work on record in Paris and Munich.

Every project →

Who we work with

Who we work with on site

Commissioning & CxA

The commissioning, mechanical and HVAC teams on site.

  • Heat and electrical load replicated at rack level
  • Repeatable, documented test regimes
  • Monitoring and reporting across every networked unit
  • Solid-state switching to follow fast GPU load changes
Speak to the team →

Colo & DC developers

Testing a hall before the hardware and the tenant arrive.

  • Test the hall before the GPUs arrive
  • De-risk handover and ready-for-service dates
  • Sale or hire, scaled unit by unit as the hall fills
  • Liquid-cooled and air, across the whole build
Speak to the team →

General contractors

Delivering the hall to programme, with the testing planned in.

  • Kit sized around the commissioning test plan
  • Load banks, manifold trolleys and flushing carts from one team
  • Flush, fill and load test the loop before handover
  • Sale or hire, delivered to site
Speak to the team →

M&E consultants

Test results to check the design performs.

  • Validation against the commissioning spec you wrote
  • Transient load behaviour, not just a static soak test
  • Documented results you can hand to the client
  • Remote and on-site support from PowerLoad
Speak to the team →
Explained

Explainers from the PowerLoad engineers

25 explainers on liquid cooling, load testing and commissioning, written out in full and searchable by what is said on camera.

Search every explainer →

Latest

Latest news

News, partnerships and events from PowerLoad.

All news →

Test the infrastructure before the GPUs arrive

Talk to us about replicating your design's live performance before the hall goes live.