Base build

Base build testingLB500LB600LB700ACLB 200Standard or solid-state switching

End-of-line

End-of-line testingLCLB 160LCLB 240ACLB 60

Applications

Cooling

Chillers and cooling plantStatic and dynamic load testing

Power

UPS systemsGeneratorsSwitchgear and power qualityProtection settings

Explained

Liquid coolingGPU load testingWater qualityLoop monitoringCommissioning

Equipment

Commissioning equipment

Manifold trolleyFlushing & refill cart

Tools

The full rangeSizing calculatorDatasheets

Services

Commissioning supportLoad bank hireHigh load simulationBespoke load banksSupply and installationMaintenance and repairDeployment and managementBuy or hireProjects

Company

AboutPartnersProjectsAcademyNewsEventsFAQ Speak to the team
Applications

Applications: what you test with PowerLoad

Six applications across cooling and power. Each page says what the test proves, which range does it and which equipment is used.

6Applications
BothDirections, load rising and falling
2Ranges: base build, end-of-line
250Units on one controller

PowerLoad equipment generates the heat and simulates the load, so the system can be tested. It is not enough to put a large amount of heat into a room and say the cooling has been tested, because the whole cooling and power system has to respond when the load changes, in both directions. Base build testing proves capacity while the hall is built. End-of-line testing replicates the rack before the GPUs are installed.

Cooling

Cooling plant and the coolant loop

Heat into the coolant loop, from the chillers to the rack.

Power

UPS, generators, switchgear and protection

Electrical load on the supply, from the riser to the rack.

A steady load and a rack are different tests

Grey is what a conventional load bank asks of a hall. Orange is what a rack of AI accelerators asks of it. Dynamic testing applies the orange.

Conventional load bank PowerLoad solid-state switching
Two ranges

Base build, then end-of-line

Every application can be tested with either range. The base build range proves capacity. The end-of-line range proves behaviour at each rack position.

  • Base build: LB500, LB600, LB700 and ACLB 200
  • End-of-line: LCLB 160, LCLB 240 and ACLB 60
  • Solid-state switching optional on base build, standard on end-of-line
Static and dynamic load testing
FAQ

Applications, answered

Cooling: chillers and cooling plant, and static and dynamic load testing. Power: UPS systems, generators, switchgear and power quality, and protection settings. The same units load the cooling and the power at once.
The base build range proves capacity while the hall is built, which is where the specification only requires static load testing. The end-of-line range replicates true rack-level heat and electrical load, so the response of the whole system is proven before the GPUs are installed. Most halls use both.
Because AI has changed the behaviour of the load, not just its size. The cooling and power systems have to respond when the load changes quickly, and in both directions, when it rises and when it suddenly reduces.
The client's commissioning agent or accredited partners. PowerLoad supplies the equipment, supports the team remotely on every project and trains them.
Where to next

The practical routes

Tell us what you need to test

Tell us the hall and the IT load. We will tell you which range and equipment fit.