Answer a few quick questions about your CDUs or racks. The tool works out how many PowerLoad units the test needs, CDU by CDU.
Team view. The full breakdown shows straight away, with no email step, and nothing is sent to Zoho.
Pick one. You can switch at any point.
Filled in with a typical project. Change any number.
The cooling capacity on the CDU datasheet.
For an N+1 design that is 1. The full hall test, at N, runs on the others.
Each hall has the same CDUs.
How each CDU and the whole hall will be loaded.
Usually 100%.
Each step is a percentage of N, the hall’s full load with the spare CDUs off. Tap a step to remove it.
The air-cooled load the hall is designed for.
Filled in with a typical project. Change any number.
A row or block of racks tested together.
Liquid 56%, air 44%. The air share runs on the ACLB 60.
The load steps each rack is taken through.
Each step is a percentage of the rack load. Liquid and air are loaded together in the same split. Tap a step to remove it.
Indicative sizing. The final configuration is confirmed per project.
Each CDU is tested on its own load, so the tool sizes one CDU first and then multiplies. Dividing the hall total by the unit size can come up short. Six 905.2kW CDUs total 5,431kW, which looks like 11 LB500s, yet each CDU needs two, so the test takes 12.
The LB500, LB600 and LB700 prove the CDUs, chillers and risers while the hall is built. The tool flags the unit that tests each CDU with the fewest units and the least spare capacity.
The LCLB 160 and LCLB 240 replicate the liquid-cooled share of each rack, and the ACLB 60 adds the air-cooled share, split the way the design specifies.
The output here is indicative. Up to 250 units run from one controller, and the final configuration is confirmed against your design, your single line and your coolant loop.