Base build

Base build testingLB500LB600LB700ACLB 200Standard or solid-state switching

End-of-line

End-of-line testingLCLB 160LCLB 240ACLB 60

Applications

Cooling

Chillers and cooling plantStatic and dynamic load testing

Power

UPS systemsGeneratorsSwitchgear and power qualityProtection settings

Explained

Liquid coolingGPU load testingWater qualityLoop monitoringCommissioning

Equipment

Commissioning equipment

Manifold trolleyFlushing & refill cart

Tools

The full rangeSizing calculatorDatasheets

Services

Commissioning supportLoad bank hireHigh load simulationBespoke load banksSupply and installationMaintenance and repairDeployment and managementBuy or hireProjects

Company

AboutPartnersProjectsAcademyNewsEventsFAQ Speak to the team
Commissioning support

Commissioning support, remote and on site

PowerLoad supports commissioning teams remotely on every project, and on site through accredited CxA partners or your own trained team.

PowerLoad engineer at the control panel during commissioning
2 rangesBase build and end-of-line
UK, EU, India, UAEWhere we support projects
RemoteSupport on every project
CxAAccredited partners on site

PowerLoad does not commission the hall. Your CxA or an accredited partner does, to their own test scripts. PowerLoad designs, builds, sells and hires the load banks, trains your team through its accreditation programme, and supports the commissioning team remotely on every project and on site through accredited CxA partners.

What is included

Support from the first planning call to handover

The commissioning team runs the test. PowerLoad makes sure it has the kit and the support to run it.

  • Remote support on every project, from planning to handover
  • On-site support through accredited CxA partners
  • Operator training for your own team through the accreditation programme
  • Guidance on positioning the units and connecting them to the loop and the electrical supply
  • Support on flush and fill, and on proving the loop before any load is applied
  • Support on the load steps your test scripts specify
  • Logged test data exported in your reporting format
Engineer running the PowerLoad control software on site
How it runs

Four stages

01

Survey and scope

We look at the hall, the loop, the connections and the programme, then size the kit around the test you have to pass.

02

Supply

Units, manifolds and hoses arrive together with documentation.

03

Support

Remote support runs through the programme, with accredited CxA partners on site where it is needed.

04

Report and hand back

Logged data exported for the witness pack, hired kit drained and collected.

Why PowerLoad

De-risk the project before the hall goes live

Give us your design and we replicate its live performance before it goes live, so commissioning teams know the infrastructure will work when the equipment goes in.

  • Your design replicated, not a generic test
  • Remote support on every project
  • On-site support through accredited CxA partners
  • Training so your own team can run the kit
Talk about your project
Manifold rig connected on site
Manifold and hose runs are made off before any load is applied.
Coolant valves during commissioning
The loop is proven clean and full before load goes on.
PowerLoad unit installed in a live data hall
A PowerLoad unit in position in a live hall.
FAQ

Commissioning support, answered

No. The client's CxA or an accredited partner commissions the hall and owns the test scripts. PowerLoad designs, builds, sells and hires the load banks, trains your team, and supports the commissioning team remotely on every project and on site through accredited partners.
Remote support on every project, and on-site support through accredited CxA partners. That covers guidance on positioning and connecting the units, support on flushing and filling the loop, support on the load steps the test scripts call for, and logged data for the witness pack.
Yes. PowerLoad trains clients' teams through its accreditation programme, and the PowerLoad Academy has operator lessons for every unit.
Base build testing with the LB500, LB600 and LB700, and end-of-line testing with the LCLB 160 and LCLB 240 GPU emulators. Both are tests the commissioning team runs; PowerLoad supplies the kit and supports the team.
Yes. The controller logs the run continuously and exports it, so results drop into the format your client or authority expects rather than being transcribed off a clipboard.
Yes. PowerLoad engineers and manufactures in the UK and has supported projects in London, Frankfurt, Helsinki, Paris, Munich and Sweden, with partners in India and the UAE.
Related

Where this usually sits

Tell us about your project

Send the hall, the IT load and the dates. We will tell you what kit and support the test needs.