The equipment is delivered, positioned, connected into your loop and your distribution, and proven under load before handover.

PowerLoad supplies the equipment it manufactures and supports its installation: delivery, positioning, coolant connection into the loop, electrical termination, start-up and a functional proof under load before handover, with full documentation. Installation into live halls is planned as its own job.
Load banks are heavy, carry coolant and connect to live distribution, so delivery to the gate is not enough.

Access route, floor loading, connection points, isolation and containment agreed before anything ships.
Units and connection equipment arrive together.
Coolant and electrical connections made off, then the loop checked before any load.
Functional proof under load, logged output, documentation, and the site left clean.
Much liquid cooling work now happens in facilities that cannot be turned off, so it is planned as an intervention from the first survey.
Tell us the hall, the access route and the connection points. We will scope the supply around them.