Base build

Base build testingLB500LB600LB700ACLB 200Standard or solid-state switching

End-of-line

End-of-line testingLCLB 160LCLB 240ACLB 60

Applications

Cooling

Chillers and cooling plantStatic and dynamic load testing

Power

UPS systemsGeneratorsSwitchgear and power qualityProtection settings

Explained

Liquid coolingGPU load testingWater qualityLoop monitoringCommissioning

Equipment

Commissioning equipment

Manifold trolleyFlushing & refill cart

Tools

The full rangeSizing calculatorDatasheets

Services

Commissioning supportLoad bank hireHigh load simulationBespoke load banksSupply and installationMaintenance and repairDeployment and managementBuy or hireProjects

Company

AboutPartnersProjectsAcademyNewsEventsFAQ Speak to the team
Supply and installation

Supply and installation of load banks

The equipment is delivered, positioned, connected into your loop and your distribution, and proven under load before handover.

A pair of PowerLoad units ready for delivery
UKManufactured and shipped
LoopAnd electrical connection
LiveHalls and new build
ProvenUnder load before handover

PowerLoad supplies the equipment it manufactures and supports its installation: delivery, positioning, coolant connection into the loop, electrical termination, start-up and a functional proof under load before handover, with full documentation. Installation into live halls is planned as its own job.

What installation covers

Delivery, connection and proof under load

Load banks are heavy, carry coolant and connect to live distribution, so delivery to the gate is not enough.

  • Offload, move and position, including restricted access routes
  • Coolant connection into the loop, with manifolds and hose runs made off
  • Electrical termination into the distribution you actually have
  • Loop flushed, filled and proven clean before load is applied
  • Functional proof under load, logged and documented
  • Handover pack with certification and operating documentation
PowerLoad engineers installing equipment on site
The sequence

Four stages, in this order

01

Site survey

Access route, floor loading, connection points, isolation and containment agreed before anything ships.

02

Delivery and position

Units and connection equipment arrive together.

03

Connect and check the loop

Coolant and electrical connections made off, then the loop checked before any load.

04

Load and hand over

Functional proof under load, logged output, documentation, and the site left clean.

Retrofit

Installing into a hall that is already running

Much liquid cooling work now happens in facilities that cannot be turned off, so it is planned as an intervention from the first survey.

  • Access, isolation and containment agreed in advance
  • Work sequenced around live plant and operational constraints
  • Connections designed for the loop you have, not a drawing of it
  • Programme built around your window rather than our schedule
See retrofit projects
FAQ

Supply and installation, answered

Yes. PowerLoad delivers the equipment, supports positioning and connection, and proves it under load, rather than leaving it at the gate. Load banks are heavy, carry coolant and connect to live distribution.
Offload and positioning, coolant connection into the loop, electrical termination, start-up, a functional proof under load, and handover with documentation. Where the site needs it, flushing and filling the loop comes first.
Yes. Manifold trolleys, hoses, valves and flushing and refill carts are part of the range, so the connection side comes from the same supplier as the load and nothing is left to be improvised on site.
Yes. Retrofit into an operating facility is a different job from a new build, with access, isolation and containment agreed before anything arrives.
Datasheets, test certification, connection and operating documentation, and the logged output from the functional proof.