Explained

Liquid coolingGPU load testingWater qualityLoop monitoringCommissioning

Equipment

Commissioning equipment

Manifold trolleyFlushing & refill cart

Tools

The full rangeSizing calculatorDatasheets

Services

Commissioning supportLoad bank hireHigh load simulationBespoke load banksSupply and installationMaintenance and repairDeployment and managementBuy or hireProjects

Company

AboutPartnersProjectsAcademyNewsEventsFAQ Speak to the team
Load bank hire

Load bank hire for data centres

Base build load banks and end-of-line GPU emulators, hired for as long as the test takes, with remote support on every project.

PowerLoad 500kW liquid-cooled load bank available for hire
160kWSmallest liquid unit
700kWLargest liquid unit
5Working days to proposal
UKFleet, built and tested

PowerLoad hires both ranges, base build load banks and end-of-line GPU emulators, with the connection equipment that goes with them, for the length of the test window rather than a fixed term. Remote support is included on every project. A survey comes first, so what arrives on site connects to your loop.

What you can hire

Two ranges, plus the connection equipment

Everything the test needs, from one manufacturer.

Buy or hire

Which one fits the project

There is no single right answer. It depends on whether you test one hall or a portfolio.

HireBuy
Best forA defined commissioning windowA portfolio you test repeatedly
CapitalOperating cost against the projectAsset on the balance sheet
Storage between projectsOursYours
Maintenance and calibrationCovered by a service agreement
AvailabilitySubject to the fleet and your datesYours whenever you need it
Remote support from PowerLoad
Bespoke connectionsFrom the standard fleetBuilt to your specification

Standardising across several sites usually tips towards buying. One hall usually does not.

Book early

Demand is seasonal, and the fleet is finite

Handover dates cluster. When three halls in the same market want the same fortnight, the projects that spoke to us first get the kit.

  • Tell us the dates before the programme is fixed, not after
  • A survey costs nothing and rules out surprises on site
  • Phased projects can reserve kit across several windows
  • A proposal, usually within five working days of the survey
Check availability
FAQ

Load bank hire, answered

Yes. Both ranges are available for hire: the LB500, LB600, LB700 and ACLB 200 for base build, and the LCLB 160, LCLB 240 and ACLB 60 for end-of-line, with the manifold trolleys and flushing and refill carts that go with them.
Most commissioning hires run from a fortnight to a few months, matched to the test window rather than a fixed term. Phased projects often hire across several windows as each hall comes online.
Remote support is included on every project. On-site support is available through accredited CxA partners, and PowerLoad trains your team through its accreditation programme.
Power at the rating we agree, a coolant connection point, access for the units and somewhere to run hoses. We survey all of that before anything is booked, so nothing turns up that cannot be connected.
It depends on the fleet and the window. Tell us the dates early. Demand clusters around handover seasons, and the halls that book earliest get the kit they need.
Talk to us. Where a client is standardising on PowerLoad across a portfolio, we would rather find a route that works than lose the standard.