Base build

Base build testingLB500LB600LB700ACLB 200Standard or solid-state switching

End-of-line

End-of-line testingLCLB 160LCLB 240ACLB 60

Applications

Cooling

Chillers and cooling plantStatic and dynamic load testing

Power

UPS systemsGeneratorsSwitchgear and power qualityProtection settings

Explained

Liquid coolingGPU load testingWater qualityLoop monitoringCommissioning

Equipment

Commissioning equipment

Manifold trolleyFlushing & refill cart

Tools

The full rangeSizing calculatorDatasheets

Services

Commissioning supportLoad bank hireHigh load simulationBespoke load banksSupply and installationMaintenance and repairDeployment and managementBuy or hireProjects

Company

AboutPartnersProjectsAcademyNewsEventsFAQ Speak to the team
Commissioning and delivery

What does PowerLoad provide across a commissioning programme?

The kit, remote support on every project, and on-site support through accredited partners.

Published 26 August 2026

1:32
Commissioning support from PowerLoad
£100kA week, per missed go-live
250Units, one controller
UKHand built and tested
5Working days to proposal

PowerLoad does not commission the hall. It designs, builds, sells and hires the load banks used at each stage, from early integration on a rising main through to end-of-line testing that replicates the power profiles of high-density GPU racks. The commissioning team runs the commissioning. PowerLoad gives it remote support on every project, full on-site support through accredited CxA partners, and training for its own people through the accreditation programme.

The full answer

Commissioning is a programme with several phases

Commissioning an AI data centre is not a single event. It is a programme with multiple phases, multiple systems and multiple handoffs between contractors, engineers and infrastructure teams.

The window is tight and a mistake is expensive, so the test equipment needs support from people who know it.

Equipment and support together

The commissioning agent or contractor runs the programme and the test scripts. PowerLoad supplies the equipment and the support behind it.

PowerLoad gives the commissioning team remote support on every project and full on-site support through accredited CxA partners. For clients who want their own people to run the kit, PowerLoad trains them through the accreditation programme.

Early-stage integration on the rising main

The first stage is far earlier than most commissioning plans assume. Connecting to a rising main allows cooling and power issues to be detected weeks ahead of traditional load testing.

An issue found then still leaves the programme room to absorb it. This is the job of the base build range, proving the plant while the hall is built.

End-of-line simulation at final commissioning

At the other end of the programme the end-of-line range replicates the power profiles of high-density GPU racks at each rack position, before the GPUs are installed.

Both ranges give live flow, temperature and pressure and exportable test data, so the early findings and the final results can be compared rather than treated as two separate exercises.

Accredited partners and trained teams

PowerLoad works with accredited CxA partners who are trained on the systems and can give full on-site support from day one.

Where a client prefers to use its own commissioning team, PowerLoad trains them through the accreditation programme. Either way, the people running the programme understand the infrastructure and the load bank at the same time.

More in this topic

Commissioning and delivery

FAQ

Answered

No. PowerLoad designs, builds, sells and hires the load banks used from early-stage integration on the rising main through to end-of-line testing. It supports commissioning teams remotely on every project, gives full on-site support through accredited CxA partners, and trains clients' teams through its accreditation programme. The commissioning agent or contractor does the commissioning.
Early-stage integration connecting to a rising main can detect cooling and power issues weeks ahead of traditional load testing, which is considerably earlier than most commissioning plans assume.