Base build

Base build testingLB500LB600LB700ACLB 200Standard or solid-state switching

End-of-line

End-of-line testingLCLB 160LCLB 240ACLB 60

Applications

Cooling

Chillers and cooling plantStatic and dynamic load testing

Power

UPS systemsGeneratorsSwitchgear and power qualityProtection settings

Explained

Liquid coolingGPU load testingWater qualityLoop monitoringCommissioning

Equipment

Commissioning equipment

Manifold trolleyFlushing & refill cart

Tools

The full rangeSizing calculatorDatasheets

Services

Commissioning supportLoad bank hireHigh load simulationBespoke load banksSupply and installationMaintenance and repairDeployment and managementBuy or hireProjects

Company

AboutPartnersProjectsAcademyNewsEventsFAQ Speak to the team
Commissioning and delivery

What is the difference between a supplier and a partner?

A supplier ships the kit. A partner supports the team using it.

Published 26 August 2026

0:45
Two commercial models
UKHand built and tested
250Units, one controller
RemoteSupport on every project
CxAAccredited partners on site

A supplier delivers the kit and moves on. PowerLoad also supports the commissioning team: remotely on every project, on site through accredited CxA partners, and by training your own team through its accreditation programme. The client's CxA or contractor runs the commissioning.

The full answer

Two models that look alike on a purchase order

On paper a supplier and a partner look almost identical, because the difference is not in the specification. It shows when the equipment has to produce a result in a live hall, after the buying decision has been made.

What the load has to prove

A specification says what a building should do. Load that behaves like the real thing shows what it does, as the load rises and as it falls.

The kit can be compared on a datasheet

From the bespoke manifolds to solid-state switching, the equipment is engineered in house and hand built and tested in the UK. That part can be compared between vendors on a datasheet, and it should be.

What clients remember

Clients remember how hands-on the support was and whether experienced people were there for on-site testing.

PowerLoad supports the commissioning team, remotely on every project and on site through accredited CxA partners. The client's CxA or contractor runs the commissioning.

More in this topic

Commissioning and delivery

FAQ

Answered

A supplier's obligation ends at delivery. A partner stays involved through the programme. PowerLoad supports commissioning teams remotely on every project, gives on-site support through accredited CxA partners and trains client teams, so the equipment and the know-how arrive together. The client's CxA or contractor runs the commissioning.
Yes. It is engineered in house, from the bespoke manifolds to the solid-state switching, and hand built and tested in the UK.
Where to next

Related reading

Comparing suppliers?

Ask each one what support they give the commissioning team the day something does not behave as expected.