Base build

Base build testingLB500LB600LB700ACLB 200Standard or solid-state switching

End-of-line

End-of-line testingLCLB 160LCLB 240ACLB 60

Applications

Cooling

Chillers and cooling plantStatic and dynamic load testing

Power

UPS systemsGeneratorsSwitchgear and power qualityProtection settings

Explained

Liquid coolingGPU load testingWater qualityLoop monitoringCommissioning

Equipment

Commissioning equipment

Manifold trolleyFlushing & refill cart

Tools

The full rangeSizing calculatorDatasheets

Services

Commissioning supportLoad bank hireHigh load simulationBespoke load banksSupply and installationMaintenance and repairDeployment and managementBuy or hireProjects

Company

AboutPartnersProjectsAcademyNewsEventsFAQ Speak to the team
Home/Explained/Visibility inside the loop/Two load banks on one manifold
Visibility inside the loop

How do two 500kW load banks connect to a manifold trolley?

An animated walkthrough of the connected configuration, outlet by outlet.

Published 26 August 2026

0:30
Animated walkthrough: two 500kW units on one manifold
1MWTwo LB500s, one manifold
LiveFlow, temperature, pressure
ValveIsolation at every outlet
OneReturn path through the CDU

Two 500kW load banks connect into a manifold trolley, which distributes coolant to the racks under test. An isolation valve at every outlet lets each one be controlled on its own, and flow returns through the CDU, so several racks are tested at once with full control of flow and return.

The full answer

Two load banks, one manifold

The animation shows two 500kW load banks, a 1MW kit, connected into a manifold trolley that distributes coolant to its outlets.

Each outlet stands for a provisioned server rack in the hall, so you test the arrangement the building will actually run, not an equivalent load somewhere convenient.

Independent control at every outlet

An isolation valve at every outlet lets each rack be controlled on its own.

One can be isolated, adjusted or dropped from the test without disturbing the rest, so a fault can be investigated while the run continues.

The return path through the CDU

Flow from each outlet returns through the CDU, closing the loop through the same equipment that serves the racks in production.

Testing the return matters as much as the supply. A set-up that proves delivery to the rack but not the return has tested half the circuit.

Testing multiple racks simultaneously

Several racks can be tested together while flow and return stay under full control.

Testing together shows how outlets interact. Circuits that perform alone can still starve one another when they all draw at once.

More in this topic

Visibility inside the loop

FAQ

Answered

Each outlet represents a provisioned server rack and has its own isolation valve, so every rack can be controlled on its own, with flow returning through the CDU.
Because circuits that perform correctly on their own can still interact when they all draw simultaneously. Testing outlets together is what reveals starvation and imbalance between them.