Base build

Base build testingLB500LB600LB700ACLB 200Standard or solid-state switching

End-of-line

End-of-line testingLCLB 160LCLB 240ACLB 60

Applications

Cooling

Chillers and cooling plantStatic and dynamic load testing

Power

UPS systemsGeneratorsSwitchgear and power qualityProtection settings

Explained

Liquid coolingGPU load testingWater qualityLoop monitoringCommissioning

Equipment

Commissioning equipment

Manifold trolleyFlushing & refill cart

Tools

The full rangeSizing calculatorDatasheets

Services

Commissioning supportLoad bank hireHigh load simulationBespoke load banksSupply and installationMaintenance and repairDeployment and managementBuy or hireProjects

Company

AboutPartnersProjectsAcademyNewsEventsFAQ Speak to the team
Home/Projects/Helsinki, Finland
Finland · Retrofit · Complex power requirements

A 1MW test, on a site
with complex power

A retrofit to liquid-cooled operation in Helsinki, recorded with complex power requirements.

Project details

Client
Global Colocation Giant
Location
Helsinki, Finland
Solution provided
CDU & Rack Level Testing
Project type
Load Bank Commissioning

As recorded by PowerLoad. Client names are not published.

1MWTest
3500kW liquid load banks
500kWPer unit
A PowerLoad 500kW liquid-cooled load bank, front three-quarter view
Scope

What is on the record

Three 500kW banks, on a site with complex power requirements.

  • Retrofit
  • AI GPU Rack Level Testing
  • Liquid Cooled
  • 3 x 500kW Liquid Load Bank
  • 1MW Test
  • Client Load Test
  • Full Load Test
  • Complex Power Requirements
  • Advanced Commissioning Reporting

Reproduced from PowerLoad's own project record. Nothing has been added to it.

A PowerLoad engineer with a hand on a control panel
How we work

Support on every project

PowerLoad supplies and hires the load banks and supports the commissioning team remotely on every project. On-site support is provided through accredited CxA partners, or PowerLoad trains your team.

Where a standard configuration does not fit, bespoke load banks are built around a site's own connections and constraints.

From the PowerLoad Services page. Not specific to this project.

Talk to us about your hall
On the record

The equipment listed

Liquid Load Bank 3 x 500kW

Liquid Load Bank

Direct cooling loop integration, dual 400/400amp supply, stainless internals.

On the record
The kit

What it looks like on the floor

Cabinets built and run up in the UK
Cabinets built and run up in the UK
A commissioning manifold, overhead
A commissioning manifold, overhead
500kW liquid-cooled bank
500kW liquid-cooled bank
A hand on a control panel
A hand on a control panel
Stainless manifold detail
Stainless manifold detail

PowerLoad equipment, photographed in our own workshop and on our own sites. Client halls are commercially confidential, so what you see here is the kit, not the customer's building.

More projects

The other halls

Planning a similar project?

Tell us the hall, the density and the programme. We will size the load banks, emulators and commissioning support around it.