Base build

Base build testingLB500LB600LB700ACLB 200Standard or solid-state switching

End-of-line

End-of-line testingLCLB 160LCLB 240ACLB 60

Applications

Cooling

Chillers and cooling plantStatic and dynamic load testing

Power

UPS systemsGeneratorsSwitchgear and power qualityProtection settings

Explained

Liquid coolingGPU load testingWater qualityLoop monitoringCommissioning

Equipment

Commissioning equipment

Manifold trolleyFlushing & refill cart

Tools

The full rangeSizing calculatorDatasheets

Services

Commissioning supportLoad bank hireHigh load simulationBespoke load banksSupply and installationMaintenance and repairDeployment and managementBuy or hireProjects

Company

AboutPartnersProjectsAcademyNewsEventsFAQ Speak to the team
Home/Projects/Paris, France
France · Phase 2 · CDU and rack level testing

500kW through
a regulated manifold

Phase 2 of a liquid-cooled retrofit in Paris, commissioned at the CDU and at rack level.

Project details

Client
Global Colocation Giant
Location
Paris, France
Solution provided
CDU & Rack Level Testing
Project type
Load Bank Commissioning

As recorded by PowerLoad. Client names are not published.

500kWLiquid load bank
1Manifold trolley
2Load tests on the record
Close detail of a PowerLoad stainless commissioning manifold
Scope

What is on the record

One bank and one trolley, fed through a regulated manifold.

  • Retrofit
  • AI GPU Rack Level Testing
  • Liquid Cooled
  • 500kW Liquid Load Bank
  • Commissioning Manifold Trolley
  • Client Load Test
  • Full Load Test
  • Advanced Commissioning Reporting

Reproduced from PowerLoad's own project record. Nothing has been added to it.

Pressure gauge and valve detail on a PowerLoad commissioning manifold
The equipment

Each outlet measured

The trolley gives each outlet its own flow meter and pressure sensor, so every rack is balanced independently rather than averaged across the row. The frame is 304-grade stainless carrying dual 4 inch manifolds, inlet on top and outlet below.

Fittings are tri-clamp with optional FD83, and the trolley integrates over I/O Link to BACnet.

Specification from the PowerLoad Commissioning Equipment page. Not specific to this project.

Talk to us about your hall
On the record

The equipment listed

Liquid Load Bank 500kW

Liquid Load Bank

Direct cooling loop integration, dual 400/400amp supply, stainless internals.

On the record
Commissioning Manifold Trolley Manifold

Commissioning Manifold Trolley

Regulated outlets, each metered for flow and pressure drop.

On the record
The workflow

Where the trolley sits in the sequence

This is the PowerLoad commissioning sequence the manifold trolley belongs to. It is how the equipment is designed to be used, not a log of this project.

Flush and fill

The cart circulates coolant through a 25 micron filter to clear swarf and debris, vents trapped air, then charges the loop from its 250L tank.

Distribute and regulate

The trolley distributes the riser feed to regulated outlets, one per rack, each with a flow meter and pressure sensor.

Load and prove

With the loop clean and balanced, the load bank applies load at the rack. Flow and pressure feed back over I/O Link and BACnet.

The kit

What it looks like on the floor

The manifold from above
The manifold from above
A commissioning manifold in a data hall
A commissioning manifold in a data hall
Stainless and braided hose
Stainless and braided hose
Pressure gauge and valve detail
Pressure gauge and valve detail
The valve row
The valve row

PowerLoad equipment, photographed in our own workshop and on our own sites. Client halls are commercially confidential, so what you see here is the kit, not the customer's building.

More projects

The other halls

Planning a similar project?

Tell us the hall, the density and the programme. We will size the load banks, emulators and commissioning support around it.