Base build

Base build testingLB500LB600LB700ACLB 200Standard or solid-state switching

End-of-line

End-of-line testingLCLB 160LCLB 240ACLB 60

Applications

Cooling

Chillers and cooling plantStatic and dynamic load testing

Power

UPS systemsGeneratorsSwitchgear and power qualityProtection settings

Explained

Liquid coolingGPU load testingWater qualityLoop monitoringCommissioning

Equipment

Commissioning equipment

Manifold trolleyFlushing & refill cart

Tools

The full rangeSizing calculatorDatasheets

Services

Commissioning supportLoad bank hireHigh load simulationBespoke load banksSupply and installationMaintenance and repairDeployment and managementBuy or hireProjects

Company

AboutPartnersProjectsAcademyNewsEventsFAQ Speak to the team
Home/Explained/Replicating GPU load/GPU emulator overview
Replicating GPU load

What is the GPU emulator load bank?

An animated overview of rack-level GPU emulation.

Published 26 August 2026

0:32
Animated overview: units distributed across the loop
Solid-stateSwitching, not contactors
160kWPer emulator unit
320kWPaired, two units
RackLevel, not just the riser

Multiple LCLB 160 GPU emulators are distributed across the chilled water loop, with CDUs positioned at each end of the system. Each unit represents an individual rack load. Flexible hose connections allow rapid deployment and reconfiguration, and isolation valves at every connection point mean a single unit can be isolated or removed without affecting the rest of the system.

The full answer

How the units sit on the loop

The animation shows multiple LCLB 160 emulators distributed across the chilled water loop, with CDUs positioned at each end of the system.

Each unit represents an individual rack load, so the arrangement mirrors the rack layout the hall is being built for rather than applying a single aggregated load at one point.

Flexible connections and rapid deployment

Flexible hose connections allow rapid deployment and simple reconfiguration. On a live commissioning programme the layout rarely stays as originally planned, and the ability to move units without reworking the connection design is what keeps testing on schedule.

That flexibility is a requirement, because phases overlap and areas become available in a different order to the one in the programme.

Isolation at every connection point

Isolation valves at every connection point let individual units be isolated or removed without impacting the rest of the system.

This is what allows testing to continue while one unit is moved, serviced or taken out, instead of the whole test environment coming down for a change to one unit.

Scaling with the rack count

The modular approach allows load testing capacity to scale in line with the number of racks on site.

Capacity is added by adding units rather than by redesigning the test, so the same approach covers a single rack and a fully populated hall. The LCLB 240 takes the same rack format for denser racks. Both sit in the end-of-line range.

More in this topic

Replicating GPU load

FAQ

Answered

Each LCLB 160 stands in for an individual rack load, positioned on the chilled water loop where that rack will sit, with CDUs at each end of the system.
Yes. Isolation valves at every connection point allow an individual unit to be isolated or removed without affecting the rest of the system.