Base build

Base build testingLB500LB600LB700ACLB 200Standard or solid-state switching

End-of-line

End-of-line testingLCLB 160LCLB 240ACLB 60

Applications

Cooling

Chillers and cooling plantStatic and dynamic load testing

Power

UPS systemsGeneratorsSwitchgear and power qualityProtection settings

Explained

Liquid coolingGPU load testingWater qualityLoop monitoringCommissioning

Equipment

Commissioning equipment

Manifold trolleyFlushing & refill cart

Tools

The full rangeSizing calculatorDatasheets

Services

Commissioning supportLoad bank hireHigh load simulationBespoke load banksSupply and installationMaintenance and repairDeployment and managementBuy or hireProjects

Company

AboutPartnersProjectsAcademyNewsEventsFAQ Speak to the team
Home/Projects/Sweden
Sweden · Liquid retrofit · 1MW test

A 1MW test on a liquid cooling retrofit in Sweden

Air-cooled racks converted to high-density liquid cooling, tested at every rack position.

Project details

Client
Global colocation provider
Location
Sweden
Solution provided
CDU and rack level testing
Project type
Liquid cooling retrofit

Client names are not published.

1MWTotal test load
2500kW liquid load banks
2Manifold trolleys
A stainless steel manifold trolley on a raised floor, with black hoses running from it into an open floor tile
Scope

Air-cooled racks, converted to liquid

PowerLoad supplied the equipment for the project's liquid cooling commissioning. Each load bank fed a manifold trolley serving up to 8 rack positions, with the pressure drop balanced at every position to prove the CDUs under real operating conditions.

  • Liquid cooling retrofit
  • Rack-level testing at every rack position
  • 2 x 500kW liquid load banks
  • 2 commissioning manifold trolleys
  • Custom-built PDU
  • 1MW total test load
Close view of a stainless manifold with flow meters showing live readings on each outlet
The testing

The whole cooling system, under load

The testing covered the CDUs, chiller performance, the primary and secondary cooling networks and full IT load simulation. It also showed where individual rack positions could be optimised.

PowerLoad's scope was setup and demobilisation. The team stayed on site for the whole testing programme, evenings and weekends included, to keep it on track.

Talk to us about your hall
The equipment

What was supplied

A PowerLoad LB500 liquid-cooled load bank 2 x 500kW

LB500 liquid load bank

One feeding each manifold trolley. See the LB500.

Base build range
A PowerLoad commissioning manifold trolley 2 trolleys

Commissioning manifold trolley

Each serves up to 8 rack positions. See the trolley.

Equipment
A grey two-door power distribution cabinet with its lower doors open and heavy black cables running out across the floor Custom build

Custom-built PDU

The site had a power limitation, so the PDU provided the 2 x 800A supplies the load banks needed. See bespoke builds.

Bespoke build
On site

What it looked like on the floor

A black liquid load bank with hoses running across the raised floor to a manifold trolley
Load bank to manifold
Black and braided hoses running down into open raised floor tiles
Hoses into the floor
A control screen charting live flow meter temperatures between 17 and 27 degrees over several hours
Live flow temperatures

Client halls are commercially confidential, so what you see here is the kit, not the customer's building.

More projects

The other halls

Planning a similar project?

Tell us the hall, the IT load and the programme. We will size the load banks and support around it.